WCWCD Toquerville Pressurized Irrigation System

WCWCD Toquerville Pressurized Irrigation System

Project:

WCWCD Toquerville Pressurized Irrigation System

Client:

Washington County Water Conservancy District

Description:

The Toquerville Pressurized Irrigation System project consisted of designing approximately 10,500 linear feet of 20” diameter HDPE irrigation line and approximately 14,000 linear feet of 4” to 12” diameter HDPE irrigation line with associated tees, valves, fittings, and service connections. The project also included the construction of a 12 acre-foot clay lined regulating reservoir and filter station.

Pictures: