Washington County Water Conservancy District - Quail Creek Water Treatment Plant Maintenance Building,
Bid Date: December 3, 2007 at 2:00 P.M. at the District Office 136 North 100 East, St. George, UT
Specification Ready Date: After November 20,2007 for a fee of $40.00
Bid Schedule: Includes the construction of a 48 foot X 60 foot cinder block maintenance building.
The upper building exterior will be finished with an elastomeric stucco facade.
The roof will be constructed with pre-engineered metal roof joists
Washington County Water Conservancy District - Santa Clara/Gates Lane Irrigation Well Redrilling Project,
Bid Date: December 17, 2007 at 2:00 P.M. at the District Office 136 North 100 East, St. George, UT
Specification Charge: $25.00
Bid Schedule: Includes the drilling, installation of new casing, well screen, gravel pack and the
development of a 16-inch diameter irrigation water well approximately 90 feet in depth
|