Washington County Water Conservancy District -
Santa Clara Pressurized Irrigation Pipeline and Sewer Outfall Line:
Includes installation of approximately 11,000 lineal feet of 8-inch through 28" diameter
HDPE pipe and associated appurtenances, and furnishing and installation of appoximately
5,300 lineal feet of 8-inch through 12-inch diameter sewer line and associated appurtenances.
In addition there will be approximately 50,000 cubic yards of earth fill and 17,000 cubic
yards of riprap placement.
Parowan City - Wastewater Treatment Expansion Project:
Includes construction of a 5 cell total containment lagoon system with a metering station,
pump station, installation of 21,600 feet of 15 inch sewer with associated appurtenances,
and the construction of a sewer metering station for the Brian Head outfall line.
|
|
St. George City - Reuse Pump Stations: Includes the
construction of three cast-in-place reinforced concrete pump stations with associated piping,
pumps, motors, mechanical, and electrical equipment. It also includes the construction of
a 250,000 gallon concrete water tank and a 250,000 gallon steel water tank
Ash Creek Special Service District - 120 East Sewer Replacement Project:
Installation of approximately 990 feet of owner provided 10-inch PVC sewer pipe and associated appurtenances.
The project also includes (6) new 60-inch manholes and approximately 7,000 S.F. of asphalt replacement.
St. George City - Bluff Street Waterline Phase 1: Construction of approximately
1900 lineal feet of 18-inch diameter Ductile Iron culinary water pipe. The project also included installing of
a meter vault and PRV valve with the vault at the Bluff Streer Wate Tank
St. George City - West side Water Improvements Phase 2 - Ledges Area Tank
This project consists of the construction of a 3 Million Gallon Reinforced Concrete tank and associated piping
and appurtenances.
Ash Creek Special Service District-100 West Sewer Replacement Project Installation
of approximately 2,540 feet of Owner provided 8-inch PVC sewer pipe. The project also includes (10) new 60-inch
manholes and approximately 30,050 S.F. of asphalt replacement.
La Verkin City - 500 West Storm Drain Project: Includes the installation of
approximately 292 L.F. of 12-inch and 288 L.F. of 18-inch storm drain pipe, with boxes and manholes.
St. George City - 100 West Storm Drain Project: Construction of approximately
1,234 lineal feet of 54-inch diameter reinforced concrete storm drain pipe. It also includes installation of storm
drain vaults and other appurtenances as necessary.
St. George City - Quail Lake By-Pass Pipeline: Installation of approximately
9,050 lineal feet of Owner supplied 60-inch steel pipe and associated appurtenances. |