Alpha Engineering Company

148 East Tabernacle St. George, UT 84770

Phone: (435) 628-6500 Fax: (435) 628-6553

 

Cul & Wastewater
 

 

Home
Municipal
Comm & Resident
Cul & Wastewater
Survey & GPS
Upcoming Projects

 

 

Alpha Engineering brings unique experience to water and wastewater projects, and has aided numerous southern Utah communities in securing funding for municipal and infrastructure improvements. We are well acquainted with the process involved in obtaining funds. We can assist with identification of funding sources, completion of funding applications and provide assistance and input in meeting with funding boards.

Washington County Water Conservancy District - Santa Clara Pressurized Irrigation Pipeline and Sewer Outfall Line: 
Includes installation of approximately 11,000 lineal feet of 8-inch through 28" diameter HDPE pipe and associated appurtenances, and furnishing and installation of appoximately 5,300 lineal feet of 8-inch through 12-inch diameter sewer line and associated appurtenances. In addition there will be approximately 50,000 cubic yards of earth fill and 17,000 cubic yards of riprap placement.

Parowan City - Wastewater Treatment Expansion Project:  
Includes construction of a 5 cell total containment lagoon system with a metering station, pump station, installation of 21,600 feet of 15 inch sewer with associated appurtenances, and the construction of a sewer metering station for the Brian Head outfall line.

St. George City - Reuse Pump Stations:
Includes the construction of three cast-in-place reinforced concrete pump stations with associated piping, pumps, motors, mechanical, and electrical equipment. It also includes the construction of a 250,000 gallon concrete water tank and a 250,000 gallon steel water tank

Ash Creek Special Service District - 120 East Sewer Replacement Project:
Installation of approximately 990 feet of owner provided 10-inch PVC sewer pipe and associated appurtenances. The project also includes (6) new 60-inch manholes and approximately 7,000 S.F. of asphalt replacement.

St. George City - Bluff Street Waterline Phase 1:
Construction of approximately 1900 lineal feet of 18-inch diameter Ductile Iron culinary water pipe. The project also included installing of a meter vault and PRV valve with the vault at the Bluff Streer Wate Tank

St. George City - West side Water Improvements Phase 2 - Ledges Area Tank
This project consists of the construction of a 3 Million Gallon Reinforced Concrete tank and associated piping and appurtenances.

Ash Creek Special Service District-100 West Sewer Replacement Project
Installation of approximately 2,540 feet of Owner provided 8-inch PVC sewer pipe. The project also includes (10) new 60-inch manholes and approximately 30,050 S.F. of asphalt replacement.

La Verkin City - 500 West Storm Drain Project:
Includes the installation of approximately 292 L.F. of 12-inch and 288 L.F. of 18-inch storm drain pipe, with boxes and manholes.

St. George City - 100 West Storm Drain Project:
Construction of approximately 1,234 lineal feet of 54-inch diameter reinforced concrete storm drain pipe. It also includes installation of storm drain vaults and other appurtenances as necessary.

St. George City - Quail Lake By-Pass Pipeline:
Installation of approximately 9,050 lineal feet of Owner supplied 60-inch steel pipe and associated appurtenances.

 

 

[Home] [Municipal] [Comm & Resident] [Cul & Wastewater] [Survey & GPS] [Upcoming Projects]

Copyright © 2003 Alpha Engineering Company
Last modified: 11/28/07